 |
16:15 |
T 12.1 |
Testing infrastructure for the quality control of ITk Pixelmodules — •Ruben Förster, Jörn Grosse-Knetter, and Arnulf Quadt
|
|
|
 |
16:30 |
T 12.2 |
Electrical tests for the quality control of ITk Pixel modules — Ruben Förster, Jörn Große-Knetter, •Niklas Grün, and Arnulf Quadt
|
|
|
 |
16:45 |
T 12.3 |
Production and Quality Control of CMS Phase-2 Inner Tracker Pixel Modules — •Chin-Chia Kuo, Massimiliano Antonello, Erika Garutti, Bianca Raciti, Jörn Schwandt, and Georg Steinbrück
|
|
|
 |
17:00 |
T 12.4 |
Core column issue investigation on ATLAS ITk pixel detector modules in Siegen — Markus Cristinziani, Qader Dorosti, Olivier Fox, Daniel Groth, •Luke Hammer, Stefan Heidbrink, Lasse Jäderberg, Nils Krengel, Leonie Krippendorf, Denise Müller, Jason Müller, Lina Reifenberg, Noah Siegemund, Waldemar Stroh, Darshil Vagadiya, Wolfgang Walkowiak, Jens Winter, Michael Ziolkowski, and Alessia Zuev
|
|
|
 |
17:15 |
T 12.5 |
2S module assembly in Aachen for the CMS Phase-2 Outer Tracker upgrade — Max Beckers, Clara Ebisch, Lutz Feld, •Nina Höflich, Katja Klein, Martin Lipinski, Daniel Louis, Oliver Pooth, Vanessa Oppenländer, Joëlle Savelberg, Michael Wlochal, and Wioletta Wyszkowska
|
|
|
 |
17:30 |
T 12.6 |
2S module assembly progress and module test results for the CMS Phase-2 Tracker Upgrade — •Max Beckers, Lutz Feld, Nina Höflich, Katja Klein, Martin Lipinski, Vanessa Oppenländer, Oliver Pooth, and Joëlle Savelberg
|
|
|
 |
17:45 |
T 12.7 |
Petal Loading for the ITk Strip Endcap — •Mariana Vivas Albornoz
|
|
|
 |
18:00 |
T 12.8 |
Segement Test on ATLAS ITk Strips End Cap — •Konstantin Mauer
|
|
|