DPG Phi
Verhandlungen
Verhandlungen
DPG

München 2019 – wissenschaftliches Programm

Bereiche | Tage | Auswahl | Suche | Aktualisierungen | Downloads | Hilfe

AKBP: Arbeitskreis Beschleunigerphysik

AKBP 2: Diagnostics, Control and Instrumentation

AKBP 2.2: Vortrag

Montag, 18. März 2019, 14:15–14:30, HS 7

Vertical Beam-Size Diagnostics at BESSY II: A Comparative Study — •Marten Koopmans1,2, Ji-Gwang Hwang1, Peter Kuske1, Markus Ries1, and Gregor Schiwietz11Helmholtz-Zentrum Berlin — 2Humboldt-Universität zu Berlin

With the VSR upgrade for the BESSY II electron storage ring [1] bunch resolved diagnostics are required for machine commissioning and to ensure the long-term quality and stability of operation. For transverse beam size measurements we are going to use an interferometric method, which will be combined with a fast intensified CCD camera at a subsequent stage. A double-slit interferometer method has already been verified successfully at BESSY II [2]. In addition the obstacle-bar method [3] is presently being tested as an alternative interferometric technique. It uses diffraction from a centered horizontal X-ray blocker for vertical beam-size determination. This technique will lead to enhanced photon statistics and possibly improve monitor resolution. We are using either π- or σ-polarized synchrotron radiation at the first of the new diagnostic beamlines for BESSY VSR. Measurements of the two interferometer schemes and X-ray pinhole as function of a vertical electron beam excitation are compared. The results will be presented and discussed at the conference.

[1] A. Jankowiak et al., eds., "BESSY VSR - Technical Design Study", HZB, Germany, June 2015. DOI: 10.5442/R0001

[2] M. Koopmans et al., in Proc. IPAC’17, pp. 149-152.

[3] J. Breunlin et. al., in Nucl. Instrum. Meth., vol. A803, pp. 55-64, 2015

100% | Mobil-Ansicht | English Version | Kontakt/Impressum/Datenschutz
DPG-Physik > DPG-Verhandlungen > 2019 > München